Pin the footing, log the movement, prove it never settled
Kit code: OK-FUS
Coming soon
A high-stakes operations workbook for contractors who underpin failing foundations with helical or push piers and install excavation shoring.
Includes a pier-count estimator, load-test and torque log, and survey movement-monitoring tracker.
Documents engineer-stamped design loads and inspection hold points to defend against settlement claims.
This kit is on the build list. Drop your email and we'll send it the day it ships — plus a
free quote calculator now. The most-requested industries get built first.
Planned modules
Pier and bracket count estimator with depth pricing
Helical torque and push-pier load-test log
Survey movement and crack-monitoring tracker
Engineer design-load and hold-point sign-off log
Excavation shoring and dewatering compliance checklist
Job costing by pier and crew day
Who it is for: Requires foundation-repair licensing, engineer-stamped designs, helical/push-pier equipment, load-test capability, and high liability insurance..