← All industries

Post-Frame & Pole Barn Construction Ops Kit

Estimate, engineer-stamp, and cost post-frame builds without leaving margin on the table

Kit code: OK-PFPB

Coming soon

Post-Frame & Pole Barn Construction Ops Kit spreadsheet template

A complete spreadsheet system for post-frame contractors erecting agricultural, equestrian, and commercial pole buildings.

  • It ships pre-built tabs for column-embedment and uplift-resistance calculations, per-square-foot bid assembly, truss and purlin takeoffs, and engineer-of-record stamp tracking.
  • Everything ties into a job-cost ledger so you know true margin before the concrete sets.
This kit is on the build list. Drop your email and we'll send it the day it ships — plus a free quote calculator now. The most-requested industries get built first.

Planned modules

  • Column embedment & post-hole concrete-volume calculator (ASAE EP486 uplift/overturning inputs)
  • Truss, purlin & girt takeoff sheet with waste-factor and lineal-foot pricing
  • Per-SF bid assembler with crane day-rate, backfill, and metal-panel line items
  • Engineer-of-record stamp & wet-seal tracking log by permit jurisdiction
  • Wind/snow load design-parameter register (ASCE 7 ground snow, exposure category)
  • Job-cost ledger with labor-hour burn vs. bid-estimate variance

Who it is for: Requires a licensed general/building contractor registration, engineer-of-record sealed drawings for uplift and wind loads, and builder's-risk plus liability insurance on framed structures..

Planned pricing: starter $59 · pro manual $229 · updates $79/yr.

← Back to the directory

More ServiceOpsKits

A kit for every trade. Browse the full directory →